PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Finished stripping the shear the bearing plate boxes Facing North-West (800x600).jpg Before Grouting base plates (800x600).jpg Constructing the Shear wall panels for Stair -4 Facing North-East (800x600).jpg Grouting steel plates Pic -1(800x600).jpg Grouting steel plates Pic -2(800x600).jpg Grouting steel plates Pic -5 (800x600).jpg Installing the shear wall panels at Stair -4 (3rd Floor) Facing South-East (800x600).jpg
Previous pageNext page Constructing the Shear wall panels for Stair -4 Facing North-East (800x600)
Constructing the Shear wall panels for Stair -4 Facing North-East (800x600)